| Type | Trip |
|---|---|
| Subject | TRNC Water Supply Project Technical Trip |
| Speaker(s) | |
| Organiser | Department of Civil Engineering |
| Organisation | Academic Unit |
| Date(s) | 8.03.2014 07:00 / 8.03.2014 |
| Venue | Mersin Tasucu TRNC Water Supply Project Construction Site |
| Language | Turkish |
| Keywords | |
| Description |
A technical trip was organised to the construction site in Mersin Tasucu to examine the TRNC Water Supply Project, which is described as the Project of the Century, with a group of 45 students from the Civil Engineering programme of the Hasan Kalyoncu University Faculty of Engineering and the participation of the Rector of Hasan Kalyoncu University, Prof. Dr. Tamer Yilmaz. The project is being carried out as a partnership between Kalyon Construction and the Malaysian-origin company SigurRos. Project Manager Abdullah Erenay gave a presentation about the project and provided the students with technical information about it. The project, which has not been implemented before, will be realised using 160 pipes of 500 metres each for an 80-kilometre-long water line to be installed suspended 250 m below the sea. He stated that, thanks to the project, which aims to transport 75 million cubic metres of water per year, the TRNC’s water needs for 50 years could be met. After the project presentation, inspections were carried out at the Firat Boru production facility, the factory where the pipes are produced, and at the facilities at Seka Port. Hasan Kalyoncu University attracts attention with its social and technical activities for students. |
